Planning Board Staff Report

 


 

PLANNING BOARD HEARING

Miami Shores Village Town Hall  Council Chambers  10050 NE 2nd Avenue  Miami Shores

Hearing Date

February 25, 2010

Meeting Time

7:00 P.M.

File Number

PZ-1-10-2010173

Folio Number

11-3205-024-0180

Owner

John J Kealy , 1431 NE 102 ST, Miami Shores FL  33138-2621

Applicant

Same

Agent

Kirk Lofgren, 340 Minorca Ave, Suite 5, Coral Gables FL 33134

Property Address

1431 NE 102 Street, Miami Shores FL  33138-2621

Legal Description

MIAMI SHORES BAY PK ESTS AMD PB 56-86 LOT 22 BLK 1 LOT SIZE 85.000 X 113 OR 12266-2772 0884 4

Property Size-Sq Ft

9,605

Building Adjusted Sq Ft

2,570

Flood Zone

AE9

 

Zoning

R25

Future Land Use Designation

Single Family Residential

Existing Use

One-family dwelling

Comprehensive Plan Consistency

Yes

Existing Structure

1-story; 3 bed/3 bath

Year Built

1955

 

Subject

Special Approvals, Sections 600, 523 & 534:

Site Plan Approval, Article 15. Waterfront Lands .Sec. 534

Development, Seawall

Action Required

Approve, Approve with Conditions, or Deny the application

Other Required Approvals

Village Building Permits

DERM Approval

Staff Report

David A. Dacquisto AICP, Director, Planning and Zoning

Report Date

January 28, 2010

                     

 

Background

 

The applicant is proposing to replace an existing 85 foot seawall along the canal at the rear of their property on 102nd Street.

 

Analysis

 

The plans are engineered and have been granted preliminary DERM approval. The village relies on DERM for the technical review of seawalls.

 

Final DERM review and approval is required before building permits can be issued by the village. 

 

Recommendation

 

Planning and Zoning staff recommends APPROVAL of the site plan with a finding that it is consistent with the technical provisions of the Code.  However, the Planning and Zoning Board must make a finding that the proposed improvements are harmonious with the community, as required in Section 523 of the Code and, in that regard, may add further conditions or delete or modify staff recommended conditions, deny the application, or continue the item for future consideration.  Should the board find that the applicant merits approval, staff recommends that the following conditions apply:

 

1)      Applicant to secure final DERM approval before a building permit will be issued.

2)      Applicant to obtain a building permit before commencing work.

3)      Applicant to meet all applicable code provisions at the time of permitting. This zoning permit will lapse and become invalid unless the work for which it was approved is started within one (1) year of the signing of the development order by the board chair, or if the work authorized by it is suspended or abandoned for a period of at least one (1) year.